The new modular gas turbine lets you plan modular gas turbine blocks that join your diesel station as demand grows.
Growing a Diesel Station Into a Gas Plant
We help diesel station owners plan the step to gas without losing the value of what they have. USP&E designs modular gas turbine blocks to work alongside existing diesel sets. USP&E is a full-service EPC and O&M contractor, not a broker.
About the modular gas turbine
The New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA is a repeatable 45MW block, available for 50 Hz and 60 Hz systems. Capacity slots run from 2028 to 2030.
Although designed with hyperscale campuses in mind, its modular approach suits any site adding large capacity in steps. Detailed technical information is shared with qualified buyers during scoping.
Integrating With a Diesel Station
Adding gas turbine blocks to a diesel station involves switchgear expansion, protection updates, power management changes and fuel gas supply. USP&E designs the integration so diesel sets move to standby, black start and peak roles while the turbines carry base load.
Where heavy fuel is part of the picture, HFO power plants can lower fuel cost.
Bridging to Your Slot
Until modular gas turbine capacity arrives, used gas turbines or additional diesel sets can cover growth. USP&E plans the bridge and the permanent blocks as one programme so nothing installed early becomes stranded.
African sites planning this path can also review diesel and HFO generators for African projects.
USP&E Offices for Modular Gas Turbine Planning
Johannesburg (22 Kildoon Rd, Bryanston), our Executive HQ, and Cape Town (31 Brickfield Road, Woodstock) lead African work on the new modular gas turbine beside diesel stations, from first site visit to handover. Ask the Colorado Springs or Johannesburg team to model modular gas turbine blocks against your diesel station’s load history. Knoxville (800 S Gay St, Suite 700) and Colorado Springs (1755 Telstar Dr, Suite 300) support US inspection and engineering, London (162-168 Regent Street) helps with structuring and finance, and Wuxi (No. 1, Ningzhou Road, Wuxi) covers China supply chain. USA | AFRICA | UK | UAE | CHINA. Behind that footprint sit 150+ power projects in 45+ countries, 25,000 MW contracted since 2002, and ISO 9001 and ISO 45001 certified management systems.
Delivery Record Behind the modular gas turbine
You are planning years ahead, so delivery record matters.
- 150+ power projects in 45+ countries
- 25,000 MW contracted since 2002
- 400+ engineers and project managers
Your Plan
Your 3-step plan: 1. Share your station’s load history and growth plan. 2. Agree modular gas turbine slots and integration design. 3. Add blocks while diesel moves to standby.
- Review diesel station load and fuel data.
- Forecast demand to 2030.
- Confirm gas supply and site space.
- Reserve modular gas turbine slots and plan integration.
- Commission blocks and reassign diesel sets.
Resources
EPC · O&M · About USP&E · Case studies · Contact · Inventory · Gas turbine inventory.
FAQ: modular gas turbines
What is the new modular gas turbine?
USP&E’s new modular gas turbine is the New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA, offered for 50 Hz and 60 Hz systems with capacity slots from 2028 to 2030.
Can modular gas turbine blocks work with a diesel station?
Yes. USP&E designs switchgear, protection, power management and gas supply so modular gas turbine blocks run alongside existing diesel sets, with diesel moving to standby, black start and peak roles.
What if I need more power before 2028?
USP&E can supply used gas turbines or extra diesel sets from inventory as a bridge, planned together with the modular gas turbine blocks so the transition is smooth.
Are performance figures for the modular gas turbine public?
USP&E shares project-specific technical information with qualified buyers during scoping. Public details cover the 45MW modular block, 50 Hz and 60 Hz options and 2028 to 2030 slots.
Is USP&E a broker for the modular gas turbine?
No. USP&E is a full-service EPC and O&M contractor, not a broker. We plan, install and operate modular gas turbine blocks as part of complete power plants.
Which offices discuss modular gas turbine slots?
USP&E discusses modular gas turbine slots from Colorado Springs and Knoxville in the USA and Johannesburg and Cape Town in South Africa, with London and Wuxi supporting finance and supply chain.
Has USP&E delivered gas turbines before?
Yes.
How do I start planning?
USP&E starts with your station’s load and fuel history and your growth forecast. An engineer then proposes block timing, integration design and any bridge capacity needed.
Take the Next Step With USP&E
Done well, the new modular gas turbine beside diesel stations turns into steady output and clean records. Done badly, it becomes a stranded asset and a dispute. Call USP&E on +27 10 822 2324, email info@uspeglobal.com or use the contact page; stock is listed on the inventory hub.